and then the chain-reaction started...
  • to get the chain box in at correct position I needed to insulate the hull at front
  • and a wall aft against the freezer
  • the freezer is dependent on the closets on both sides
  • the closets must be ready inside first - otherwise I can't hardly reacht inside
  • ventilation must be done before the closets
  • heating must be done before closets too
  • ....

The insulation is below waterline PU and above 50 mm rockwool with Alu and wire mat. Easy to stamp to woodframes.

Routes where decided/made for water, cables and heating tubes.

Ventilation from dorados is distributed thrue 3" tubes.
The thin white tubes is for interiour light cables.
Heating convectors mounted behind closets front.