And the Radar Arc is designed! All pieces in place but need to do the final welding (and polish) on lower altitudes ;-)
The bollards in place, fastenings for liferaft and it's line is in place, and the big ventilation hole for the lazarette area is made.
Not to mention the inside in the lazarette where the two propane tanks had their fastenings and the dividing "wall" inside and fixing the flooring - no pics.